(Aug 14, 98) The existing curb has been removed to make way for new paving on the north side. You can see the finished color of the stucco-like surface on the side of the tower. |
(Aug 14, 98) The white and gray wall surfaces in this photo will receive the same tan color stucco-like finish as the previous photo. The roofing is finished and sidewalks will be poured in the next few weeks. |
(Aug 14, 98) This photo is taken from the upper floor connection to the existing building and shows the large gathering space - the old breezeway area. |
(Aug 14, 98) The main concourse area has received its first coats of paint and will soon be carpeted. It is intended that this large area will encourage friends to stay around and chat. |
(Aug 14, 98) This is one of the five lower level preschool room openings onto a secured playground area outside. |
(Aug 2, 98) Here's an earlier photo showing the new concourse from the sanctuary entrance. |
|